Our Damen 2309 Multicat, Paul D, sailed to Rotterdam to collect a 250m long floating dredge pipe, which she then towed back to Portsmouth.
Once the pipeline was installed on the beach, Paul D provided 24-hour support connecting and shifting the pipeline and supporting the TSHD Strandway.
On completion of the project, Paul D towed the floating pipeline back to the Netherlands, where her crew dismantled the line using her powerful deck crane.